Apartment by CITI DEVELOPERS “AMRA Phase 2” NEW LAUNCH
AED 2,400,000
Share Share
Vector icon 3 Beds Vector icon 3 Baths Vector icon 1690 sqft

Al Raudah

Daria
Daria Property broker

Get in touch with broker using email, phone or WhatsApp. It’s free and does not require any commitment from your side

AMRA Phase 2 3BR Apartment — High-Demand Rental Location

AMRA Phase 2 by Citi Developers sits within the Blue Carbon zone on the lagoon shore of Umm Al Quwain — one of the UAE’s emerging residential and leisure destinations

These 157 sq m apartments in Towers D or E offer a compelling entry point for investors looking at off-plan property in the UAE with a flexible post-handover payment plan, as well as for families seeking a spacious, self-contained coastal residence outside Dubai. Handover is scheduled for 2029.

Unit highlights

— three well-proportioned bedrooms with a clear separation of private and living zones;
— generous open-plan living and dining area;
— 157 sq m (1,690 sq ft) of usable space — ample room for a family;
— glass facades and wide balconies overlooking the lagoon and sea;
— off-plan status with early-stage pricing locked in ahead of 2029 completion.

AMRA Phase 2 amenities

— swimming pools for residents;
— beachfront-view fitness centre;
— yoga and pilates studios;
— massage rooms and sauna;
— children’s play room;
— co-working and lounge zones;
— lounge bar and private cinema;
— Isabella Cucina Italiana and Hunter & Barrel restaurants;
— organic supermarket, art gallery and pharmacy — all on-site.

Architecture and concept

AMRA Phase 2 is the second phase of a five-tower development connected by a shared podium in the Blue Carbon coastal zone. Towers D and E each rise to fourteen residential floors. The architecture blends organic curves with floor-to-ceiling glazing, allowing the facade to mirror the stillness of the lagoon. Interiors follow the same restrained philosophy — natural stone, wood and glass in a light palette that prioritises brightness and a sense of openness.

About the developer

Citi Developers is a UAE-based developer focused on waterfront residential projects, with a consistent emphasis on integrated resort-style amenities and considered architecture.

Payment plan

70/30 with post-handover instalments:
— 10% — on booking;
— 60% — during construction;
— 30% — after handover, spread over 3 years interest-free.
Completion — 2029.

Location — Umm Al Quwain, Blue Carbon zone

— 15 minutes to Marjan Island;
— 40 minutes to Dubai International Airport;
— direct access to Sheikh Mohammed Bin Zayed Road.

Frequently asked questions

Is the on-site infrastructure really at resort level, or just a standard gym and pool?
— It genuinely goes beyond the basics: a beachfront gym, yoga and pilates, sauna, massage rooms, a private cinema, lounge bar, two restaurants, an organic supermarket, an art gallery and a pharmacy are all part of the AMRA Phase 2 complex.

Is the post-handover plan interest-free?
— Yes. The 30% payable after handover is split across three years with no interest charges.

Are these apartments suitable for families?
— Three bedrooms across 157 sq m, a dedicated children’s play room and a secured waterfront environment make this a practical choice for family living.

What is the investment case for Umm Al Quwain?
— The emirate is developing steadily as both a residential and tourism destination. The Blue Carbon waterfront zone is one of its priority growth areas, and tenant demand from those seeking a quieter, more affordable alternative to Dubai continues to grow.

Can I get floor plans and a yield projection?
— Yes — enquire via the form on this page and we’ll send current floor plans along with a tailored financial breakdown for this specific unit.

Enquire via the form on this page to receive up-to-date floor plans and a full investment overview for this three-bedroom, 157 sq m apartment in AMRA Phase 2.

Payment plan

Down payment
10% + 5000 AED OQOOD and Admin fee
On signing SPA
10%
1st – 47th installments
47% (1% monthly)
48th installment
3%
Post handover 3 years
30% (0.83% per month) + 2% DLD

Property information

Handover Date

Q4 2029

Property Type

Apartment

Ownership Type

Freehold

Location Al Raudah Al Raudah

Building Information

Building name

CITI DEVELOPERS “AMRA Phase 2” NEW LAUNCH

Citi Developers
Citi Developers View developer

Location

Contact broker to learn more and get special offers.